Visit to Drill Site East West Link

Visit to proposed Drill sites

PPL and RPPG reps  met at 12 noon at the Football Pavilion between Brens Drive and H G Smith Ovals

See Map of drill sites. We visited EWL-B12 – 012 first on the crown of the hill in the grasslands This was an aboriginal corroboree site and are important grasslands and habitat for grasslands parrots and feeding ground for flocks of native birds.  We also checked out EWL-B12-013 and 014.

The group then drove around to Brens Drive park outside the State Netball and Hockey Centre then walked back to meet at Anzac Hall.  We inspected the drilling site next to or opposite Anzac Hall.

See  EWL-B12-007 at the corner of O’Neill Street and Canning Street Carlton on the triangle of land near the Dan O’Connell Hotel Drilling will start there on Monday next.  The Dan O’Connell Hotel only got a note under its door on Thursday afternoon advising of the drilling. .

You do realise that the drill sites indicate the alignment of the EW Link and that the Government wont be able to afford a tunnel so as we were told during the Eddington Review the motorway will be “cut and cover” – cut now cover in 5 years if ever.